e-Zinc, Toyota Tsusho to develop pilot zinc-air battery project
06
Jun
The project will be hosted at Eurus Energy America Corporation’s (EEAC) Bull Creek wind facility in Borden County, Texas (Bull Creek) where excess wind energy will be stored in the e-Zinc battery system. EEAC can then use the stored energy to power buildings at the local facility. e-Zinc said that the system is expected to store power for 24 hours which is better suited to the intermittency of wind generation than typical batteries.