New Zealand's expanding wind, solar and geothermal fleet appears to be helping generators conserve hydro water, not just pushing thermal plants off the grid, Transpower says. The national grid operator compared May to September in 2023 and 2026, two periods with broadly similar hydro inflows. In 2023 lake storage dropped 38%. In 2026 it edged up from 3,053GWh to 3,127GWh, even though thermal output fell 54% and demand was slightly higher. Transpower presents this as early evidence rather than proof, and it says the figures cannot measure exactly how much water renewables saved. The difference still matters for security of supply, because stored water is the backstop when wind and sun fall short.
Key takeaways
- Storage diverged: Hydro storage fell from 4,295GWh to 2,665GWh between the end of May and the end of September 2023, but rose from 3,053GWh to 3,127GWh over the same months of 2026.
- Renewables up, thermal down: Comparing May to September 2026 with the same months of 2023, geothermal, wind and solar produced an extra 2,100GWh. Thermal generation dropped by about 800GWh, a 54% fall, and hydro was down 3%.
- September snapshot: Thermal generation in September dropped from 333GWh in 2023 to 43GWh in 2026, and solar supplied 66GWh in September 2026 after recording none three years earlier.
- Transpower's caveat: Transpower says its data cannot quantify the water conserved, and that cheap water offers in 2023, driven by high early-year storage, deepened that year's drawdown.
- Dry-year gap remains: MBIE estimates a significant dry year could need about three terawatt-hours of back-up over three months, with Huntly's strategic coal reserve covering up to half and 1.5TWh still unaccounted for.
Table of contents
- Key takeaways
- Two Winters With Similar Inflows, Opposite Storage Paths
- Where the Extra 2,100GWh of Renewable Output Came From
- Why Transpower Stops Short of Counting the Water Saved
- A Growing Pipeline Still Leaves a 1.5TWh Dry-Year Gap
- What could strengthen or weaken the water-saving case
- What to be careful about
- Frequently asked questions
Two Winters With Similar Inflows, Opposite Storage Paths
Transpower's latest weekly market report sets 2023 against 2026 because the rain and snowmelt feeding the hydro lakes were broadly comparable in both years. With inflows roughly level, the storage trend becomes a cleaner test of what changed on the supply side of the system.
Hydro storage is measured in gigawatt-hours (GWh), the amount of electricity the water held in the lakes could produce. At the end of May 2023 it stood at 4,295GWh. Four months later, at the end of September, it had sunk to 2,665GWh, a fall of 38%.
Over the same months of 2026, storage moved the other way, rising modestly from 3,053GWh to 3,127GWh, a gain of about 74GWh. That happened while demand ran slightly higher and thermal plants generated far less. The 2026 season began roughly 1,242GWh lower than 2023 did, yet by the end of September the lakes held about 462GWh more than at the same point three years earlier.
Where the Extra 2,100GWh of Renewable Output Came From
Between May and September 2026, geothermal, wind and solar together produced 2,100GWh more than in the same window of 2023. Thermal generation, meaning output from fuel-burning power stations, shrank 54%, or roughly 800GWh. Hydro output slipped 3%.
September shows the shift most sharply. Thermal output that month fell from 333GWh in 2023 to 43GWh in 2026. Solar went from nothing to 66GWh: Transpower recorded zero solar output in September 2023, and grid-scale solar only came online later that year.
Across the five months, renewables lifted their share of generation from 90.1% in 2023 to 95.1% in 2026. Geothermal plays a distinct part in that mix. Unlike wind and solar, it runs steadily day and night, so it eases the call on hydro whatever the weather is doing.
Why Transpower Stops Short of Counting the Water Saved
Transpower attached two caveats to its comparison. Storage was unusually high at the start of 2023, which likely led generators to offer their water at lower prices. That pricing behaviour steepened the 2023 drawdown and flatters the contrast with 2026.
The operator also said the data cannot be used to work out a volume of conserved water. One extra GWh of renewable output does not automatically leave one GWh more in the lakes, because prices, transmission constraints and wider system conditions all shape which plants run.
Its broader point concerns role rather than volume. In Transpower's view, hydro's worth lies increasingly in the flexibility stored water offers at moments of system stress, not only in the energy it produces. Thermal plants, it said, are likely to be called on more selectively, when wind and solar output is weak or demand peaks, once additional renewables and grid-scale batteries are commissioned.
A Growing Pipeline Still Leaves a 1.5TWh Dry-Year Gap
Forsyth Barr estimates that 1,736 megawatts (MW) of new renewable capacity is now being built, expected to generate about 3,500GWh a year. Another 4,784MW holds consent, though not every project is certain to proceed. Whether they go ahead will depend partly on how future demand develops.
More renewables do not remove the need for back-up during long dry spells, especially when wind and solar are also weak. The Ministry of Business, Innovation and Employment (MBIE) puts the back-up needed in a severely dry year at roughly three terawatt-hours (TWh), spread across three months. Up to half of that should come from Huntly's strategic coal reserve, leaving 1.5TWh still to find.
Transpower's security of supply assessment warned that dry-year risk could appear as early as 2028 if domestic gas supplies decline. That puts the question on the desk of the incoming Government, once formed: how to cover the gap, whether through imports of liquefied natural gas (LNG) or some other route.
| Measure | 2023 | 2026 |
|---|---|---|
| Storage, end of May | 4,295GWh | 3,053GWh |
| Storage, end of September | 2,665GWh | 3,127GWh |
| Change in storage | Down 38% | Up about 74GWh |
| Thermal generation, September | 333GWh | 43GWh |
| Solar generation, September | None recorded | 66GWh |
| Renewable share, May to September | 90.1% | 95.1% |
What could strengthen or weaken the water-saving case
The case for
- Forsyth Barr counts 1,736MW of renewable capacity under construction, expected to add about 3,500GWh a year of output.
- A further 4,784MW is consented, which could add more supply if demand expectations justify building it.
- Geothermal's steady round-the-clock output reduces the call on hydro regardless of wind and solar conditions.
- Grid-scale batteries, as they arrive, could let thermal plants be reserved for narrower windows of low renewable output or high demand.
The case against
- Transpower says the comparison cannot quantify water saved, and high early-2023 storage likely exaggerated that year's drawdown.
- Prices, transmission constraints and system conditions can override renewable output in generators' dispatch decisions.
- MBIE's dry-year estimate leaves 1.5TWh of back-up uncovered after Huntly's coal reserve.
- Transpower has flagged dry-year risk as early as 2028 if domestic gas supplies decline.
What to be careful about
- A significant dry year could require about three terawatt-hours of back-up over three months, and only half is covered by Huntly's strategic coal reserve.
- Consented projects totalling 4,784MW may not proceed if demand expectations soften, slowing the renewable build.
- Declining domestic gas supplies could bring dry-year risk forward to 2028, according to Transpower's security of supply assessment.
- The 2023 versus 2026 comparison rests on one pair of years, and Transpower itself says it cannot isolate the water saved by renewables.
The bottom line
Transpower's comparison gives the long-held theory its first real test in the data. With similar inflows, the lakes drained 38% in 2023 but held steady and grew in 2026, as 2,100GWh of extra geothermal, wind and solar output pushed thermal generation down 54%. The operator is careful not to overclaim: cheap water offers in 2023 widened the gap, and no one can yet say how many gigawatt-hours renewables kept in storage. What the evidence does support is a shift in hydro's job, from bulk supplier towards flexible reserve. That reserve still has limits. A severe dry year could need three terawatt-hours of cover, Huntly supplies at most half, and the decision on the rest falls to the next Government.
What to watch
- Watch for the incoming Government, once formed, to set out how it will cover the 1.5TWh dry-year shortfall, whether through LNG imports or another option; no date has been set.
- Watch 2028, the earliest year Transpower's security of supply assessment says dry-year risks could emerge if domestic gas supplies decline.
- Watch whether the 1,736MW of renewable capacity Forsyth Barr counts as under construction reaches the grid and adds its expected 3,500GWh a year; no completion dates have been given.
Frequently asked questions
Does geothermal help New Zealand save hydro water?
Transpower says geothermal matters because it generates steadily around the clock, cutting reliance on hydro whatever the wind and solar conditions. Geothermal was part of the combined 2,100GWh rise in renewable output from May to September 2026 compared with 2023.
How much water have renewables actually saved in New Zealand hydro lakes?
Nobody has put a number on it. Transpower says its data cannot calculate the volume conserved, because generation choices also depend on prices, transmission constraints and system conditions. It also notes that high storage in early 2023 likely encouraged cheaper water offers that year.
How much dry-year backup does New Zealand need?
By MBIE's reckoning, a three-month dry spell of real severity could call for around 3TWh of support. Huntly's strategic coal reserve is expected to supply as much as half, with the remaining 1.5TWh yet to be covered.
What new renewable capacity is being built in New Zealand?
Forsyth Barr estimates 1,736MW is under construction, with expected generation of about 3,500GWh a year. A further 4,784MW has consent, though not all of it is guaranteed to be built.