• About WordPress
    • WordPress.org
    • Documentation
    • Learn WordPress
    • Support
    • Feedback
  • Log In
Search
Login Register
  • Level 3, 11 York Street, Sydney, NSW 2000
Clean Energy Skills
  • Courses
    • Hydrogen
    • Net Zero
    • Electricity Infrastructure
    • Wind
    • Solar
    • Geothermal
    • EV & Mobility
    • Battery Storage
    • Hydropower
  • Intelligence
  • For Individuals
  • For Organizations
  • Blog
    • NFT
  • Contact Us
  • Courses
    • Hydrogen
    • Net Zero
    • Electricity Infrastructure
    • Wind
    • Solar
    • Geothermal
    • EV & Mobility
    • Battery Storage
    • Hydropower
  • Intelligence
  • For Individuals
  • For Organizations
  • Blog
    • NFT
  • Contact Us
Clean Energy Skills > Long-Duration Energy Storage
1GWh Stoney Creek BESS gets construction approval in NSW
1GWh Stoney Creek BESS gets construction approval in NSW
04
Oct

NSW has approved the 125 MW / 1,000 MWh Stoney Creek BESS, backed by a 14-year LTESA; site works start Q4 2026 and commercial operations target H1 2028.

Posted in: Long-Duration Energy Storage ,
EnergyPathways Secures £15 million to Advance LDES
EnergyPathways Secures £15 million to Advance LDES
03
Oct

EnergyPathways has closed a £15 million financing package and begun FEED for its long-duration energy storage (LDES) project while securing Gas Storage

Posted in: Long-Duration Energy Storage ,
Virginia Plan Flags Long-Duration Storage for Rising Demand
Virginia Plan Flags Long-Duration Storage for Rising Demand
02
Oct

Virginia’s 2026 energy plan includes long-duration storage to help meet rising demand, limit bill increases and assign data-center grid costs fairly.

Posted in: Long-Duration Energy Storage ,
Compressed air energy storage MESH seeks policy certainty
Compressed air energy storage MESH seeks policy certainty
01
Oct

EnergyPathways’ MESH would use salt caverns for 300 MW/55.2 GWh CAES; CEO Ben Clube says FID is targeted for 2028 and first operations by end of 2031.

Posted in: Long-Duration Energy Storage ,
EnergyPathways Advances MESH Toward £1bn Financing
EnergyPathways Advances MESH Toward £1bn Financing
30
Sep

EnergyPathways is advancing the Marram Energy Storage Hub (300MW/55GWh) alongside gas and hydrogen projects, and seeks financing for a £1.02bn-£1.20bn

Posted in: Long-Duration Energy Storage ,
Long-duration storage could replace gas at similar cost
Long-duration storage could replace gas at similar cost
29
Sep

ANU study: long-duration storage (pumped hydro) can run Australia’s National Electricity Market without fossil gas at similar total cost over time.

Posted in: Long-Duration Energy Storage ,
Long-duration energy storage and UK energy resilience
Long-duration energy storage and UK energy resilience
26
Sep

Long-duration energy storage is central to UK resilience: infrastructure firms point to Ofgem LDES funding, grid upgrades and standardisation.

Posted in: Long-Duration Energy Storage ,
ZincGel Battery Pilot at Keele University
ZincGel Battery Pilot at Keele University
25
Sep

Keele University will pilot Offgrid Energy Labs’ ZincGel battery, a zinc‑bromine long‑duration system to capture about 1 MWh of surplus renewables monthly.

Posted in: Long-Duration Energy Storage ,
Invinity Energy Systems Moves on Interim Results
Invinity Energy Systems Moves on Interim Results
24
Sep

Invinity Energy Systems moved after publishing interim results on 22 September 2026; shareholders are watching order momentum and manufacturing progress.

Posted in: Long-Duration Energy Storage ,
Pylontech Starts Mass Production of 588Ah and 601Ah LFP Cells
Pylontech Starts Mass Production of 588Ah and 601Ah LFP Cells
23
Sep

Pylontech began mass production of 588Ah and 601Ah large-format LFP cells for utility/commercial ESS, links 601Ah to PyOcean and notes open questions.

Posted in: Long-Duration Energy Storage ,
  • 1
  • 2
  • 3
  • 4
  • Next

Tags

acquires largest records Revolutionary Statkraft surge

Recent posts

Bangladesh approves 442 MW solar plant with 8-hour storage Bangladesh approves 442 MW solar plant with 8-hour storage
Battery storage ,
1.2GW Big Rooter solar project breaks ground near Aggieland 1.2GW Big Rooter solar project breaks ground near Aggieland
Solar Energy ,

About

Advance your career in an industry undergoing massive transformation with global investment in clean energy to surpass $1.5trn anually by 2025.
Increasing renewable energy demand is accelerating energy industry convergence. Don’t miss growth opportunities to to take your career to the next level.
Learning Now

Popular Courses

  • Wind Energy System Design
    Free
     
    By Clean Energy Skills
  • Electricity infrastructure roadmap
    Free
     
    By Clean Energy Skills
  • Fundamentals of Biomass energy
    Free
     
    By Clean Energy Skills

Links

  • Blog
  • Contact Us
  • Courses
  • For Individuals
  • For Organizations
  • Intelligence

Contact

  • Level 3, 11 York Street, Sydney, NSW 2000
  • +61 2 8387 5582
  • Info@cleanenergyskills.com
Copyright © 2026 Clean Energy Skills | Powered By NASMAK Technologies Pty Ltd
      Sign In
      The password must have a minimum of 8 characters of numbers and letters, contain at least 1 capital letter
      I want to sign up as instructor
      Remember me
      Sign In Sign Up
      Restore password
      Send reset link
      Password reset link sent to your email Close
      Your application is sent We'll send you an email as soon as your application is approved. Go to Profile
      No account? Sign Up Sign In
      Lost Password?