Airports’ Net Zero Push Lets Capacity Grow
Airports net zero strategies use digital twins and low‑carbon design to add capacity without new construction; Schiphol saved €82,000 and 375 tons of CO2.
House passed HB3173 to convert orphaned wells for geothermal; the Senate stalled it, leaving 19,000+ wells and a 235-year plug queue.
Slate truck delivery date: emails viewed by Business Insider list December 2026 as an early-delivery option; many buyers still face delivery windows into
Ballard bought GeoPura to solve hydrogen fuel availability and logistics, enabling Energy-as-a-Service while using GeoPura’s UK electrolysis+distribution.
Nepal hydropower resilience: August 2026 floods damaged roughly 10% of generation and prompted calls to add wind and solar to diversify supply and cut
Centrica hires 500 veterans into smart energy, engineering and heat pump roles via its Armed Forces Pathway to expand the net-zero workforce.
UN warns 1.5°C target may be missed; a Dutch startup’s portable wind turbine uses two blades, survives major storms, fits in a standard container and
Ballard Buys GeoPura: $372 million deal brings GeoPura’s HPU platform, green hydrogen production and UK distribution into Ballard; $112M cash and 49.6M
Optimal Transit’s 100 MW floating data center Kraaken pairs OTEC power, desalination and 60 MW AI compute to deliver 40 MW ashore and 30 million L/day.
Nepal hydropower floods have left more than 1,000 dead and about 4,000 missing; survivors and rescuers are searching tunnels and trying to reach trapped